Was This Garage Conversion Permitted? How to Check, and What to Do If It Was Not

Book a free site visit. Leave your number and we will call you back.

← Back

Got it.

We will call you back within 15 minutes: 8am to 5pm Monday to Thursday, 8am to 2pm Friday. Urgent right now? Call (818) 934-0075.
What are you thinking about?(required)

Rather talk now? Call (818) 934-0075.

In the City of Los Angeles you can check it yourself, online. The building department publishes permits back to 1905 and Certificates of Occupancy back to 1940. A garage conversion that was permitted should show a permit, finaled inspections and, for a living unit, a Certificate of Occupancy. If those are missing and the unit was built before January 1, 2020, state law now gives owners a path to permit it that a city cannot simply refuse. (Sources: Los Angeles Department of Building and Safety and California Government Code section 66311.7, linked below. The building department decides eligibility for a specific property.)

Why the permit record matters

A converted garage can be finished inside and have no permit on record. The difference shows up later: when you sell, refinance, insure it or rent it out. The Los Angeles building department says permits and inspections are required by law and give you documentation if you sell or refinance (LADBS, About the Construction Process). The city’s own permit report goes further: the legal use of a building can only be determined by a valid Certificate of Occupancy issued after the required inspections (City of LA, Permit and Inspection Report help). If a garage was turned into a bedroom or a rental unit without that trail, the records still say “garage”.

Existing garage interior on the Encino property
A garage on one of our Encino ADU lots, before the work started.

How to check, step by step

These tools are for properties inside the City of Los Angeles. If your address is served by another city or by LA County, that department keeps its own records.

  1. Search the building records online. LADBS publishes building permits from 1905 to the present, Certificates of Occupancy from 1940, range files that record violations, plot plans and approved building plans (LADBS, Property Records). Search by address.
  2. Look for a permit that describes the conversion. The work description should say what was done, for example a garage converted to a dwelling unit or an ADU.
  3. Check that the inspections were finaled. The Permit and Inspection Report shows each permit with its inspection activity and any code enforcement on the property (LADBS, Property Records). A permit that was issued but never finaled is not the same as finished, approved work.
  4. Look for a Certificate of Occupancy. For a living unit, this is the document that settles its legal use.
  5. Check for violations. The range files are where code violations are recorded. An open case on the property is something to understand before you buy or build.
  6. If you cannot find it online, LADBS says more records are available by email from its Records Section or by appointment at its Metro and Van Nuys offices. Copies of blueprints need the owner’s written authorization (LADBS, Property Records).

If you are buying a house with a converted garage

In the City of Los Angeles, the seller has to provide a disclosure document called the 9A Report in every real estate transaction (LADBS, Property Records). Read it next to the online records. If the house is advertised with an extra unit, a guest suite or “bonus room” where the records show a garage, ask the seller for the permit and the Certificate of Occupancy for that space. Your real estate agent or attorney can tell you what the seller must disclose in your specific sale.

If it was never permitted: what the law now offers

California now has a specific rule for unpermitted ADUs and junior ADUs built before January 1, 2020. It now sits in Government Code section 66311.7. In short, the statute says:

  • The city cannot deny the permit just because the unit does not meet today’s building code or local ADU rules. The exception is where fixing the problem is necessary to meet the state’s basic health and safety standards, and the rule does not cover a building found to be substandard.
  • No penalty for having had the unpermitted unit. If an inspector finds health and safety problems, the city approves the permits needed to fix them.
  • Some charges are waived. The owner does not pay impact fees or connection or capacity charges, except where utility work is needed for health and safety.
  • You can look before you apply. Cities must tell homeowners that they may get a confidential code inspection from a licensed contractor first, to learn the unit’s condition and the likely scope of work.

The City of Los Angeles put this into a written process in July 2026 (LADBS Information Bulletin P/BC 2026-161). The bulletin calls it a penalty-free amnesty program, and its result is a permit and a Certificate of Occupancy. What it asks for:

  • Proof the unit existed before January 1, 2020. At least one document such as a rent registration certificate, contractor bills or material receipts, utility bills or insurance documents for the unit, code enforcement papers, a signed and dated lease, or real estate documents such as loan papers, an appraisal or an old listing.
  • The city’s forms and a site plan showing property lines, the existing permitted buildings, the unit, its distances, easements and driveways.
  • The latest Certificate of Occupancy and permits for the permitted buildings on the lot.
  • A plan check fee paid when you submit.

Not every unit fits the streamlined route. The bulletin lists exceptions, including a basement, more than one story, a steep slope, a fault, landslide or liquefaction zone, attachment to an apartment or commercial building, construction other than light framing, and being too close to another building. Those go through a different bulletin and may need full plans.

If the conversion was built after January 1, 2020, this amnesty does not cover it, and it goes through the regular permit process.

Checklist you can use for your own house or one you are buying

  1. Is the property inside the City of Los Angeles, or served by another department?
  2. Did you search the online building records by address?
  3. Is there a permit whose work description matches the conversion?
  4. Were its inspections finaled?
  5. Is there a Certificate of Occupancy for the living space?
  6. Any violations in the range files?
  7. If buying: does the 9A Report match what you see on site?
  8. If unpermitted: was it built before January 1, 2020, and what documents prove that?
  9. Before applying: would a confidential inspection of the unit’s condition help you know the scope?

How it works with MAMOS

  • MAMOS Construction & Design is a licensed California contractor, license number 1092889. You can verify it yourself at cslb.ca.gov.
  • One team handles the design, the permits and the build.
  • We prepare the drawings, file the city submittal, answer the plan-check corrections and meet the inspectors.
  • We start with a free site visit. After we have seen your property, you get a written scope and quote for your address.
  • We call back within 15 minutes: 8am to 5pm Monday to Thursday, 8am to 2pm Friday. Phone (818) 934-0075.

Sources (accessed 2026-10-05)

This article explains what published laws and agency pages say. It is not legal advice. Rules change, and the building department decides eligibility and requirements for a specific property.

Questions homeowners ask

How do I find out if my garage conversion has a permit?

In the City of Los Angeles, search the building department’s online records by address. They include building permits back to 1905, Certificates of Occupancy back to 1940 and records of violations, and the Permit and Inspection Report shows each permit with its inspections. Look for a permit describing the conversion, finaled inspections and a Certificate of Occupancy for the living space. (LADBS, Property Records.)

Can an unpermitted garage conversion be legalized?

If it is an ADU or junior ADU built before January 1, 2020, state law says the city may not deny a permit just because the unit does not meet current building standards or local ADU rules, unless the fix is needed for basic health and safety, and it may not penalize the owner for having had the unit. The City of Los Angeles runs this as a written amnesty process with its own documents and exceptions. Units built after that date go through the regular permit process. (Government Code 66311.7; LADBS Information Bulletin P/BC 2026-161.)

What proves the unit was built before 2020?

The Los Angeles bulletin accepts at least one document such as a rent registration certificate, contractor bills or material receipts, utility bills or insurance documents for the unit, code enforcement papers, a signed and dated lease, or real estate documents such as loan papers, an appraisal or a listing. (LADBS Information Bulletin P/BC 2026-161.)