California law puts a hard ceiling on the down payment, and after that a contractor may not ask for or accept more than the value of the work already done or the materials already delivered. The state’s contractor board treats ADU construction, including garage conversions, as home improvement, so those rules apply to your project. In practice that means a written contract, a payment schedule tied to finished stages of work, and a receipt for every payment. (Sources: Business and Professions Code 7159.5, and the Contractors State License Board ADU leaflet, both linked below. Rules change, and the city and the state board decide for a specific project.)
Why payments go wrong
A build is paid for in stages, but a contract can be written in almost any way. If payments are set by calendar date, or as a few large installments, the money can get ahead of the work. Then, if anything interrupts the job, such as a cash-flow problem, a dispute with a trade, or a disagreement about what was included, you have paid for work that is not in the ground or on the walls yet.
The law tries to prevent this at three points. The down payment has a ceiling. Every later payment has to match finished work or delivered material. And that limit also reaches payments that come from a lender or financier (Business and Professions Code 7159.5). The state board has also said that complaints about ADU work have been rising (ABC7, 27 Sep 2025). It publishes a plain-language leaflet for ADU homeowners (CSLB Fast Facts, Rev 11/2025).

What the law requires
- It must be in writing. The board says a written home improvement contract is required for an ADU. Verbal promises offer little or no protection, so anything you were told that is not in the contract should be added to it.
- The down payment has a ceiling. The statute sets it as the lower of two limits. The exact wording is in section 7159.5(a)(3); read it there rather than relying on a summary.
- After the down payment, pay for work done. The contractor may not request or accept payment above the value of the work performed or material delivered. If the contract has payments before completion, it must include a schedule in dollars and cents that names the work and materials each payment covers.
- Lien releases. On request, after each payment and before the next one, the contractor must furnish a full and unconditional release from potential lien claims for the work paid for. You may withhold further payments until you get them.
- Changes go in writing first. A change order has to be signed by you and the contractor before the change is made, and it becomes part of the contract.
- You can cancel. The board says you have three days after signing to cancel a contract, with longer periods in two cases it lists in its leaflet.
What “tied to a stage of work” looks like
The state board’s ADU leaflet gives a sample progress schedule as an illustration. It breaks a ground-up ADU into stages a homeowner can see and an inspector can check: getting started on site, demolition and site preparation, foundation, framing, rough mechanical, electrical and plumbing, roof and exterior wrap, insulation and drywall, flooring, tile and cabinets, finish work, final inspection, and a last payment only when the punch list is done and the keys are handed over. A garage conversion has fewer stages, but the idea is the same: each payment points at something you can walk up to and look at.
If a schedule says only “second payment” or “payment due in month two”, ask which stage of work it refers to. If you cannot check a payment against the site, it can get ahead of the work. (CSLB Fast Facts, Rev 11/2025; Business and Professions Code 7159.5(a)(4).)
Checklist to use with any contractor
- Is the contract in writing, and does it include the scope of work, a project timeline, a payment schedule, materials and finishes, the contractor’s license number and the notice of cancellation rights?
- Is the down payment within the statutory ceiling? Read section 7159.5(a)(3) yourself.
- Does every later payment name a stage of finished work or delivered material, instead of a date?
- Does the schedule add up to the contract total, with nothing left vague?
- If a lender or financier pays the contractor, is that money also tied to finished work?
- Will you get a lien release with each payment? Ask for it in writing before you pay the next one.
- Has anyone asked you to pay for plans or permits before work begins? The board suggests asking for an accounting of what the plans cost, or checking with the engineer or architect who drew them, and confirming permit fees with your city or county building department.
- Who is handling underground utilities (plumbing, electrical, and more), and is that in the scope?
- How will changes be handled? Insist that every change is a signed change order before the work happens.
- Did you get at least three bids and compare what each one includes?
- Have you looked the contractor up at cslb.ca.gov, and asked to see the pocket license and proof of insurance?
- Do you have a receipt for every payment, and a folder with every document?
What if someone asks for more than the contract or the law allows?
Stop and ask them to show you the line in the contract and the statute that allows it. You can call the Contractors State License Board at 800-321-CSLB (2752) or check a license at cslb.ca.gov. A contractor who leaves a project without a legal excuse is also something the board can act on (Business and Professions Code 7107).
How it works with MAMOS
- MAMOS Construction & Design is a licensed California contractor, license number 1092889. You can verify it yourself at cslb.ca.gov.
- One team handles the design, the permits and the build.
- We prepare the drawings, file the city submittal, answer the plan-check corrections and meet the inspectors.
- We start with a free site visit. After we have seen your lot, you get a written scope and quote for your address.
- Financing options exist, and we walk through them at the consultation.
- We build every ADU on site.
- We call back within 15 minutes: 8am to 5pm Monday to Thursday, 8am to 2pm Friday. Phone (818) 934-0075.
Sources (accessed 2026-09-30)
- Contractors State License Board, “Fast Facts: Tips for Building a Residential Accessory Dwelling Unit (ADU)”, Rev 11/2025: https://cslb.ca.gov/Resources/GuidesAndPublications/2025/FastFacts_ADU.pdf
- California Business and Professions Code section 7159.5 (amended by Stats. 2023, ch. 403, effective 1 Jan 2024): https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7159.5
- California Business and Professions Code section 7107: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7107
- CSLB, “Learn About Home Improvement Contracts”: https://www.cslb.ca.gov/Consumers/Hire_A_Contractor/Home_Improvement_Contracts/What_Is_A_Contract.aspx
- CSLB, “Contracts and Binding Agreements”: https://www.cslb.ca.gov/Consumers/Hire_A_Contractor/Contracts_And_Binding_Agreements.aspx
- ABC7 Los Angeles, 27 Sep 2025: https://abc7.com/post/southern-california-woman-scammed-thousands-hiring-contractor-accessory-dwelling-unit/17889784/
This article explains what published rules say. It is not legal advice. Rules change, and the city and the state board decide for a specific lot and contract.
Questions homeowners ask
Can a contractor ask me to pay for plans or permits before the work starts?
The state contractor board tells homeowners to be careful with requests like this. It suggests asking the contractor for an accounting of what the plans cost, or contacting the engineer or architect who drew them to confirm the cost and that they were paid, and checking permit fees with your city or county building department. Permits are obtained through your local city or county. (CSLB Fast Facts, Rev 11/2025.)
What should be in the written contract before I sign?
The board lists: the scope of work, the project timeline, the payment schedule, materials and finishes, the contractor’s license number and the notice of cancellation rights. If you and the contractor discussed anything that is not written, ask to have it added. You have three days after signing to cancel, with longer periods in two cases the board lists. (CSLB Fast Facts, Rev 11/2025.)
What if I want to change something halfway through the build?
The change should be written up as a change order, signed by you and the contractor before the change is made. It describes the change, what it adds or subtracts, and becomes part of the contract. (CSLB, “Learn About Home Improvement Contracts”, and “Contracts and Binding Agreements”.)