When Will My Contractor Start? What the Contract Must Say

Book a free site visit. Leave your number and we will call you back.

← Back

Got it.

We will call you back within 15 minutes: 8am to 5pm Monday to Thursday, 8am to 2pm Friday. Outside those hours you are first on the list the next morning. Urgent right now? Call (818) 934-0075.
What are you thinking about?(required)

Call (818) 934-0075.

In California, a home improvement contract has to say what counts as the real start of the work, give an approximate start date, and give an approximate completion date. Any change to the job has to be signed before the changed work begins and has to say how it affects the completion date. Those three lines, plus an agreement on who you call and how often you hear back, are what keep a project from drifting. (Source: Business and Professions Code 7159, linked below. Rules change, and the state board and the courts decide on a specific contract.)

Why jobs drift

Most late jobs slip a little at a time. A start date slides a week. A crew is pulled to another job. A change is agreed in conversation, but nobody writes down what it does to the schedule. Calls take longer to come back. After a few months, the homeowner and the contractor remember different finish dates, and there is no page that settles it.

The state contractor board calls the contract “the most important communication tool” between you and your contractor (CSLB, Terms of Agreement). When the contract is silent on dates, every later conversation about delay starts from nothing.

Slab corner with anchor bolts, Encino ADU
Slab poured, anchor bolts set: an early stage on one of our Encino ADUs.

What the law asks the contract to include

California’s home improvement contract law, Business and Professions Code section 7159, lists items that must be in the contract. The ones about time are:

  • What counts as starting. A statement that describes what “substantial commencement of work” means for your job. Without it, a truck dropping off a portable toilet could be called the start.
  • An approximate start date, under that heading.
  • An approximate completion date, under that heading.
  • A description of the project and of the significant materials and equipment. A clear scope matters for time, because work that is not described is where arguments about “extra” work begin.
  • Signed before work begins. You are entitled to a copy of the contract, signed and dated by both of you, before any work is started.
  • Change orders that name the time effect. A change has to be in writing and signed before the changed work starts, and it has to state the scope of the change, what it adds or subtracts, and its effect on the progress payments or the completion date.
  • Who is doing the work. The contract must say whether subcontractors will be used. If yes, you can ask for a list with each one’s name, contact information, license number and classification.

Leaving out the required items is cause for discipline by the state board, and the prime contractor is responsible for completing the project according to the contract, plans and specifications (7159(a)(5)). Separately, the board can act when a contractor wilfully fails, without a legal excuse, to move a project forward with reasonable diligence and that causes material injury (Business and Professions Code 7119), and when a contractor abandons a project without a legal excuse (7107).

The board’s own consumer page adds two practical points: the contract needs written direction on who gets the permits, and it must provide a date of completion (CSLB, “Learn About Home Improvement Contracts”).

Dates you can check on site

An approximate date is only useful if both of you can tell whether it is being kept. Some things that help, with any contractor:

  • Write the start in plain terms. “Work starts when demolition begins on site” is easier to check than “upon mobilization”.
  • Tie the middle of the job to stages. A schedule that names stages (foundation, framing, rough inspections, drywall, finishes, final inspection) lets you see progress with your own eyes. If you already use a payment schedule tied to stages of finished work, the same stages can carry the dates.
  • Separate the city’s part from the contractor’s part. Plan check and inspections are run by your city or county. Ask the contract to say who files the permit, who answers corrections and books inspections, and how waiting time at the city will be communicated. The board’s checklist also says to confirm that your contractor will obtain the permits (CSLB, What You Should Know Before Hiring a Contractor).
  • Put every change through the change order. If the change moves the finish date, the change order is where that belongs, by law.

For an ADU, the city has its own clock

If your project is an ADU, including a garage converted into an ADU, state law puts deadlines on the city’s side of the schedule too (Government Code section 66317):

  • Is the application complete? The permitting agency has to decide whether the application is complete and tell the applicant in writing within 15 business days of receiving it. If something is missing, it has to list the missing items and explain how to complete the application, and on the resubmittal it cannot ask for items that were not on that list.
  • Approve or deny. When a house already stands on the lot, the agency has to approve or deny a completed ADU application within 60 days. If the applicant asks for a delay, that time is paused for the length of the delay. If the agency does not act within the 60 days, the law says the application is deemed approved.
  • A denial comes with comments. If the application is denied, the agency has to return a full written set of comments listing what is deficient and how to fix it.

What this means for your contract: ask your contractor to show the city steps as separate lines on the schedule (submittal, completeness notice, corrections, approval), and to tell you in writing when each notice arrives. Then a delay at the city is visible as a delay at the city, and a delay on the job site is visible as one too. These rules apply to ADU permits; a kitchen or bathroom remodel follows your city’s normal permit process. Rules change, and your city applies them to your lot.

Ask what every time estimate depends on

A quote often gives one span of months for design, permits and construction. That span only means something once it is broken down. Before you sign, ask:

  • Which part of that span is design, which part is the city, and which part is building?
  • What would make each part longer, and who is responsible for each of those things?
  • Which decisions do you need from me, and by when, so that I am not the cause of a delay?
  • When does the approximate completion date in the contract start counting: from signing, from the permit, or from the start of work on site?

Agree on how you will hear from each other

Long silences turn a small delay into a big worry. The law does not set an update schedule, so this part is up to the two of you. Ask, before you sign:

  • Who is my one point of contact, and what is the best number to reach them?
  • How will I hear about progress, and how often? A short weekly message with a photo or two is a common choice, but agree on whatever works for you.
  • How quickly do you return calls, and who covers when that person is out?
  • How will I be told if a date is going to move, and will that come in writing?

The board recommends asking for current contact information for the contractor, the subcontractors and the suppliers, and keeping a job file with your contract, payments and photographs (CSLB, What You Should Know Before Hiring a Contractor).

Checklist to use with any contractor

  1. Does the contract say what “substantial commencement” means for this job?
  2. Is there an approximate start date and an approximate completion date, under those headings?
  3. Are the scope and the significant materials described specifically enough that you could tell if something is missing?
  4. Does it say who pulls the permits, answers plan-check corrections and books inspections? For an ADU, are the city steps shown as their own lines on the schedule?
  5. Are the middle stages of the job named, so you can see progress on site?
  6. Is every change written and signed before the work, with its effect on the finish date stated?
  7. Does the contract say whether subcontractors will be used? If yes, have you asked for the list?
  8. Do you have one named contact, a phone number that gets answered, and an agreed way and rhythm for updates?
  9. Is cleanup and debris removal written into the contract?
  10. Did you get a copy signed and dated by both of you before any work started?
  11. Are you keeping a job file: contract, change orders, receipts, messages and dated photos?
  12. Have you looked up the license at cslb.ca.gov?

If the job has already slowed down

Write to the contractor, keep it short and factual, refer to the dates in the contract, and ask for a written updated schedule. Keep a copy, and keep taking dated photos. If you cannot get an answer, the Contractors State License Board takes complaints online at cslb.ca.gov or by phone at 800-321-CSLB (2752). For a dispute about money or the contract itself, talk to an attorney.

How it works with MAMOS

  • MAMOS Construction & Design is a licensed California contractor, license number 1092889. You can verify it yourself at cslb.ca.gov.
  • One team handles the design, the permits and the build.
  • We prepare the drawings, file the city submittal, answer the plan-check corrections and meet the inspectors.
  • We start with a free site visit. After we have seen your property, you get a written scope and quote for your address.
  • We call back within 15 minutes: 8am to 5pm Monday to Thursday, 8am to 2pm Friday. Phone (818) 934-0075. Office hours are Monday to Thursday, 8:00am to 5:00pm, and Friday, 8:00am to 2:00pm.

Sources (accessed 2026-10-02)

This article explains what published rules say. It is not legal advice. Rules change, and the state board and the courts decide for a specific contract.

Questions homeowners ask

The contract only gives an “approximate” completion date. Does that mean anything?

California law requires the contract to state an approximate completion date, under that heading (Business and Professions Code 7159). What happens when it passes depends on the contract and the facts. Separately, the state board can take disciplinary action when a contractor wilfully fails, without a legal excuse, to move a project forward with reasonable diligence and that causes material injury (section 7119). For your own situation, ask the board or an attorney.

If I change something halfway through, does the finish date change too?

It can, and the law says the change order should tell you. A change order has to be written and signed before the changed work begins, and it has to state the scope of the change, what it adds to or subtracts from the contract, and its effect on the progress payments or the completion date (section 7159).

How long can the city take to approve an ADU permit?

State law sets two deadlines. The city has 15 business days to tell you in writing whether the application is complete, with a list of anything missing. Once the application is complete, and a house already stands on the lot, it has 60 days to approve or deny it; a delay you ask for pauses that time, and if the city does not act within the 60 days the law says the application is deemed approved (Government Code section 66317). If the application was incomplete and you resubmit it, the 15-business-day completeness step applies again. Rules change, and your city applies them to your lot.