Skip to content
Licensed & Insured. CSLB #1092889 Serving the San Fernando Valley & the Westside Service Areas FAQ Client Support (818) 934-0075
MAMOS Construction & Design

Mamos Construction & Design

Mamos Construction & DesignROOFING
(818) 934-0075
Roofing  ›  Los Angeles County  ›  Long Beach

Half of Long Beach was built before 1960, and 18 of its neighborhoods have rules about the roof.

FREE WRITTEN ROOF INSPECTIONNO CHARGE

← Back

Got it.

Joseph will call you at the number you gave within 15 minutes: 8am to 5pm Monday to Thursday, 8am to 2pm Friday. Outside those hours you are first on the list the next morning. Urgent right now? Call (818) 934-0075.

Call (818) 934-0075

How old your roof is, from permit records
How many years it has left, checked from the roof itself
Whether your address is in a fire hazard zone
Dated photos and notes, in writing for your insurance agent

If the roof still has good years left, the report tells you.

Roof replacement and free written roof inspections across Long Beach. The median home in the city was built in 1959. Inside a historic district the city reviews the material and the color before the work starts, and near the water the marine air wears on every piece of metal up there.

EMBERS 010203

Deck, underlayment, then shingles or tile. The underlayment keeps the water out, and you can only check it from up on the roof.

CSLB 1092889Check it yourself at the state license board
5.0 on YelpFrom all seven of our reviews
Free, no obligationYou keep the report either way
Dated photosTaken on your roof, in every report

What we check on a Long Beach roof

Is the house in a district?

The City Council has designated 18 historic districts, from Bluff Park and Belmont Heights to California Heights and the Wrigley Area. Inside one, a re-roof needs a Certificate of Appropriateness before anything comes off.

Metal near the water

Flashing, drip edge, vents and nails are the parts that age first in coastal air. We look at every one of them, because a rusted seam leaks long before the shingles look tired.

How much has been patched

The city lets small amounts of roofing go without a permit, up to 500 square feet in twelve months. Past that, it is a permitted job, and a roof that has been patched for years is usually closer to that line than the owner thinks.

Attic: old spaced-board deck with water staining
Attic: old spaced-board deck with water staining. Every report has dated photos like this one, taken in the attic.

Before the rain in Long Beach

Marine air all year, then a winter of storms off the ocean.

Rust at the seams

Salt air works on flashing, vents and fasteners year round. A corroded seam at a chimney or wall is where the first long storm usually gets in.

Flat roofs behind parapets

Spanish and Mission style homes often hide flat sections behind a parapet. If the scuppers and drains are blocked, a two-day storm becomes standing water.

Old homes, newer additions

Many Long Beach homes predate 1960 and have been added onto since. The joint where a newer roof meets the original is worth a look before December.

Before the first big storm: book the free roof check, or read our winter storm roof guide.

A Long Beach roof, start to finish

A shingle roof we installed in Long Beach: new deck, Owens Corning Duration Cool shingles and metal valleys.

Long Beach roof: Owens Corning Duration Cool shingles and underlayment rolls on the new deck
01  New deck, shingles and underlayment loaded.
Long Beach roof: new brown shingles with metal valleys and pipe vents
02  Shingles on, metal valleys in.
Long Beach roof: ridge caps and metal valleys going on
03  Ridge caps going on.
Long Beach roof finished: brown architectural shingles and capped ridge
04  The finished roof.

From our roofs

Recent MAMOS roofing work: shingle re-roofs, flat ADU roofs and tile.

Shingle re-roof in progress in Encino, new ridge vents and flashing going in
Re-roof in Encino: new shingles, ridge vents and pipe flashings going on.
Two roofers in harnesses laying architectural shingles over new underlayment
Shingles going down over new underlayment, roofers tied off.
Crew rolling out Polyglass underlayment on a new ADU flat roof
ADU flat roof: underlayment rolled out before the cap sheet.
Finished white cap sheet on an ADU flat roof with every vent flashed and sealed
The same ADU roof finished: white cap sheet, every vent flashed and sealed.
Tarzana re-roof finished: new gray architectural shingles, ridge caps and a flashed skylight
Re-roof in Tarzana, finished: new shingles, ridge caps, skylight flashed.
Clay barrel tile roof with a new gutter line along the eave
Clay barrel tile with a new gutter line along the eave.

The rules that apply to a Long Beach roof

Set by the City of Long Beach. In a historic district the city approves the material first.

PERMIT
500 sq ft

Roofing beyond 500 square feet in twelve months needs a building permit from the City of Long Beach. Coatings do not.

HISTORIC
18 districts

Landmarks and homes in a historic district need a Certificate of Appropriateness for a re-roof. It comes first and does not replace the permit.

SHINGLES
No black

In the districts, composition shingles must be dimensional with a 30 year minimum, and midnight or black shingles are not allowed.

We get on the roof, photograph what we find and write it up.

Get my free report

In a historic district, the paperwork comes before the roof.

The city’s re-roof application asks for the existing and proposed material, the brand, the color and the roof area in scope. Our written report, with dated photographs, gives you most of that before you fill it in.

1951

the median year built for homes in ZIP codes 90806 and 90807. Across Long Beach as a whole, more than half of all housing went up before 1960.

Finished shingle re-roof in Encino
Shingle re-roof in Encino, finished. New underlayment, skylight flashing, then architectural shingles.

Roof questions in Long Beach

Repair or replace?

Usually the underlayment decides it, and you have to get on the roof to check that. The report gives you the answer, with photos.

What does a new roof change for my insurer?

Most letters name roof age. The permit and completion papers show the new roof’s date; what the carrier does with them is its decision.

Do I need the city’s approval to re-roof in a historic district?

Yes. On a landmark or inside one of the 18 districts, a Certificate of Appropriateness is issued before the work, and the building permit is still required on top of it. Clay tile coping on flat roofs has to be reused, so we plan around it from the start.

Know what your roof needs, and what the city will ask.

The report gives you roof age, remaining life and condition in writing, plus whether your address sits in a historic district. The answer may be a replacement, or a repair and a few more years.

“Joe was extremely helpful and went above and beyond what a good contractor would do for his customer. … Joe is an honest and trustworthy contractor whom I would hire again for any future project.”

FARRELL F.  ·  YELP
ROOF & INSURANCE REPORTREQUEST FORM

Request your report

Remaining roof life, district status, and what the city will want to see. We call back within 15 minutes: 8am to 5pm Monday to Thursday, 8am to 2pm Friday.

← Back

Got it.

Joseph will call you at the number you gave within 15 minutes: 8am to 5pm Monday to Thursday, 8am to 2pm Friday. Outside those hours you are first on the list the next morning. Urgent right now? Call (818) 934-0075.
What brings you here?(required)

Call (818) 934-0075.
We call or text you about this request only. Your details are never sold or shared.

Mamos Construction & Design
Long Beach  ·  Signal Hill  ·  Lakewood  ·  Seal Beach
☎ Call Schedule a Consultation